ID 19546

Date Of Advertisement From Nov 07, 2024 to Jan 02, 2025

Azul Works Inc

An Equal Opportunity Employer
is requesting quotations from all qualified
DBE, DVBE, MBE, SBE, SLB, LBE
sub-contractors and/or material suppliers for the following project:

Reference: County of Napa
Construction & Demolition Facility Napa-Vallejo Waste Management Authority Project No. 17810
Devlin Road, American Canyon, CA 94503 and on portions of Devlin Road, APN 057-090-085-000
Located in Sonoma County, CA

Owner: County of Napa

Bid Date:  12/03/2024 at 10:00AM

We are requesting bids for the following trades and/or material suppliers:

Item
No. Item Description Units Qty Item Price Total
1 Mobilization and Demobilization LS 1
2 Division 1 – Traffic Control LS 1
3 Division 1 – Field Staking/ Layout LS 1
4 Division 3 – Concrete Forming LS 1
5 Division 3 – Concrete Reinforcing LS 1
6 Division 3 – Cast in Place Concrete LS 1
7 Division 5 – Structural Steel Framing LS 1
8 Division 5 – Steel Stud Framing LS 1
9 Division 6 – Rough Carpentry LS 1
10 Division 6 – Architectural Woodwork LS 1
11 Division 6 – Casework & Countertops LS 1
12 Division 7 – Metal (Light Gauge)
Framing LS 1
13 Division 7 – Insulation LS 1
14 Division 7 – Metal Roof and Siding LS 1
15 Division 7 – Metal Roof Canopy LS 1
16 Division 7 – Sheet Metal Gutter and DS LS 1
17 Division 7 – Waterproofing LS 1
18 Division 7 – Joint Sealants LS 1
19 Division 8 – Windows LS 1
20 Division 8 – Doors LS 1
21 Division 9 – Acoustical Tile Ceilings LS 1
22 Division 9 - Gypsum Wallboard LS 1
23 Division 9 – Acoustic Treatment LS 1
24 Division 9 – Painting and Coating LS 1
25 Division 9 - Wall Coverings LS 1
26 Division 9 - FRP LS 1
27 Division 9 – Tile, Solid Surfacing LS 1
28 Division 9 – Flooring LS 1
29 Division 10 – Toilet Partitions LS 1
30 Division 10 – Lockers LS 1
PROPOSAL FORM
P-3
31 Division 10 - Accessories LS 1
32 Division 13 – Pre-Engineered Metal
Building LS 1
33 Division 21 – Fire Suppression LS 1
34 Division 22 – Plumbing Rough LS 1
35 Division 22 – Plumbing Finish LS 1
36 Division 23 - Ventilation LS 1
37 Division 23 – HVAC LS 1
38 Division 26 - Lighting LS 1
39 Division 26 - Electrical LS 1
40 Division 28 – Electronic Safety +
Security LS 1
41 Division 31 – Demolition and Site
Clearing LS 1
42 Division 31 – Ballast Rock Removal YDS 390
43 Division 31 – Select Fill YDS 18,240
44 Division 31 – Site Stripping, Clearing
and Grubbing YDS 4,400
45 Division 31 – Overexcavation and
Recompaction YDS 22,800
46 Division 31 – General Earthworks YDS 9,600
47
Division 31 – Excavated or
Overexcavated Material Placed
Adjacent to Bioretention Basin
YDS 500
48 Division 31 - Bioretention Soil Mixture YDS 710
49 Division 31 - Bioretention Class 2
Permeable Material YDS 480
50 Division 31 – Erosion Control LS 1
51 Division 32 – AC Pavement TON 3,222
52 Division 32 – Aggregate Base - AB
provided by owner YDS 8,210
53 Division 32 – Pavement Gravel Edge
Protection LF 460
54 Division 32 – Concrete Deepened Curb LF 1,275
55 Division 32 – 6” Reinforced Concrete
Paving SF 81,652
56 Division 32 – 4” Class A Concrete
Walkway SF 2,517
57 Division 32 – 6” Crushed Rock for
generator area SF 1,511
58
Division 32 – 2” AC Grind and Overlay
on North Facility pavement, including
Devlin Road repaving
TON 192
PROPOSAL FORM
P-4
59
Division 32 – Remove and Replace
Existing Drainage Inlet Top Frame and
Grate
LS 1
60 Division 32 – Striping, Standard Parking
Stall LS 1
61 Division 32 – Striping, Accessible Stall
& ADA Access LS 1
62 Division 32 – Striping, Fire Lane LS 1
63 Division 32 – Signage, Accessible Stall EA 4
64 Division 32 – Signage, Fire Access
Route EA 4
65 Division 32 – Parking Stall Wheel Stops EA 32
66 Division 32 – ADA Truncated Domes SF 74
67 Division 32 – Exterior removable and
non-removable 6” Bollards EA 54
68 Division 32 – Galvanized Chain Link
Fence LF 2,048
69 Division 32 – Gates LS 1
70 Division 32 – Planting Irrigation SF 25,796
71 Division 32 – Planting SF 25,796
72 Division 32 – Hydroseed SF 38,443
73 Division 33 – Emergency Generator and
Future Battery Conduit Trench LF 140
74 Division 33 – Fire Water Line, 6” LF 115
75 Division 33 – Fire Water Line, 8” LF 1792
76 Division 33 – Fire Water Line, 10” LF 248
77 Division 33 – Reduced Pressure
Detector Assembly, 10” EA 1
78 Division 33 – Fire Hydrant Assembly
including valve, anodes and riser EA 4
79 Division 33 – PIV/FDC Assembly EA 1
80 Division 33 – Domestic Water, 2” PVC
Pipe, including trenching & backfill LF 45
81 Division 33 – Domestic Water, 2.5” PVC
Pipe, including trenching & backfill LF 60
82
Division 33 – Domestic Water, Reduced
Pressure Backflow Preventer &
Concrete Pad
EA 1
83 Division 33 – Domestic Water, Water
Meter Christy Box EA 1
84 Division 33 – Recycled Water, 2” PVC
Pipe, including trenching & backfill LF 92
85
Division 33 – Recycled Water, Reduced
Pressure Backflow Preventer &
Concrete Pad
EA 2
86 Division 33 – Recycled Water, Water
Meter Christy Box EA 2
PROPOSAL FORM
P-5
87 Division 33 – Sewer, 4” PVC Pipe,
including trenching and backfill LF 326
88 Division 33 – Sewer Cleanouts EA 6
89 Division 33 – Sewer Point of Connection
at manhole LS 1
90
Division 33 – Private Fiber Optic
Conduit Run, including trenching &
backfill
LF 140
91
Division 33 – Storm Drainage, 4”
Perforated PVC Back of Wall Drain,
including trenching and backfill
LF 392
92
Division 33 – Storm Drainage, Solid 4”
PVC Back of Wall Drain Connection,
including trenching and backfill
LF 684
93
Division 33 – 4” Perforated PVC Under
Slab Drain, including trenching and
backfill
LF 17,246
94 Division 33 – Storm Drainage, 6” HDPE,
including trenching and backfill LF 1120
95 Division 33 – Storm Drainage, 8” HDPE,
including trenching and backfill LF 600
96 Division 33 – Storm Drainage, 10”
HDPE, including trenching and backfill LF 172
97 Division 33 – Storm Drainage, 12”
HDPE, including trenching and backfill LF 504
98 Division 33 – Storm Drainage, 18”
HDPE, including trenching and backfill LF 450
99 Division 33 – Storm Drainage, Precast
Concrete Drainage Inlet 18”x18” EA 2
100 Division 33 – Storm Drainage, Precast
Concrete Drainage Inlet 24”x24” EA 2
101 Division 33 – Storm Drainage, Precast
Concrete Drainage Inlet 36”x36” EA 2
102 Division 33 – Storm Drainage, Precast
Concrete Drainage Inlet 48”x48” EA 2
103 Division 33 – Storm Drainage, Rock
Outfall EA 21
104 Division 33 – Storm Drainage, Pipe Flap
Gate 4” EA 5
105 Division 33 – Storm Drainage, Pipe Flap
Gate 6” EA 7
106 Division 33 – Storm Drainage, Pipe Flap
Gate 10” EA 4
107
Division 33 – Storm Drainage,
Bioretention/Basin Overflow
Weir/Pyramat
LS 1
108 Division 33 – Storm Drainage, run-on
Pyramat LS 1
109 Division 33 – Storm Drainage, Storm
Drain Cleanouts, including Christy box EA 13
110 Division 33 – Storm Drainage,
Downspout Connection Fittings EA 31
111 Division 33 – Storm Drainage, Flared
end section, HDPE EA 11
PROPOSAL FORM
P-6
112 Division 33 – Storm Drainage, ACO Slot
Drain 12” LF 287
113 Division 33 – Storm Drainage, 4-foot
concrete valley gutter LF 440
114 Division 33 – 4” Conduit, PVC FT 130
115 Division 33 – 4” Iron End Cap for Post EA 6
116 Division 33 – Transformer Pad 106” x
90” EA 1
117 Division 33 – Removable Post 4” Steel,
80” EA 3
118 Division 33 – Fixed Post, 4” Steel, 80” EA 3
119 Division 33 – 5/8” Ground Rod EA 2
120 Division 33 – 4” Swedge Coupling EA 1
121 Division 33 – 4” Bend, 45d, 60” Radius EA 1
122 Division 33 – 4” Bend, 90d, 36” Radius EA 2
123 Division 33 – 4” End Bell EA 1
124 Division 33 – 4” Cap Plug EA 2
125 Division 33 – Colored Reflecting Tape EA 6
126 Division 48 – Electrical Power
Generation LS 1

Bid documents can be viewed at or obtained from:
https://www.countyofnapa.org/bids.aspx?bidID=446 

Proof of:

DIR# 
CA Lic#
category business#: Example DBE#

Azul Works Inc
1400 Egbert Ave, San Francisco CA 94124
San Francisco, Cali 94124

Phone: 4155581507  Fax:
Email: estimating@azulworks.com
Chris Kahney

Published Nov 07, 2024 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: 1-888-786-9450 Fax: 209.772.3573

This solicitation Ad will be archived 30 days after the bid date