ID 723118
Butte County
Owner Reference: 01-2024
Bid Date: 11/01/2024 at 04:00pm
Trades: *Construction Management / General Contractor (CMGC)
The Sewerage Commission – Oroville Region (SC-OR) is soliciting request of qoutations from firms to provide construction management and special testing services for Phase 1 of SC-OR’s Wastewater Treatment Plant Upgrade project. The Phase 1 Wastewater Treatment Plant upgrade project will consist of the following components: SCADA Control System Mixed Liquor Distribution Box Secondary Clarifier Return Sludge Pump Station Tertiary Filtration Pipework Installation of two Multimedia Pressure Vessels Remodel Grit Chamber (Grit Washer, Grit Pump Grit Chamber Liner) Oder Control System Bio Filter Septage Receiving Facility Plant Drain Facilities Tie in Below is the scope of work that will be required for this project. 1. Design Development and Construction Document Services This phase includes but is not necessarily limited to consulting services for project meetings; review of the building design and functions; review and recommendations of the plans and specifications for buildability, trade conflicts and plan/specification consistency; evaluation of alternative methods and materials; outreach efforts to potential contractors and subcontractors; and construction scheduling evaluation. 2. Facility Construction Management Services This phase includes complete service normal and customary to construction management services including but not necessarily limited to: providing a construction management plan document; construction contract administration; assist with billing process facilitation of weekly construction meetings and issuance of minute meetings notes; project record keeping including logs and other tracking methods; prepare and update project schedule and budget as needed; review and coordination of construction submittals, RFIs, payment applications, and proposed change orders; construction observation and field reports; inspection and testing coordination; cost and schedule evaluation; quality assurance and control; issue Notices of Nonconformance; closeout coordination regarding punch list preparation and final inspections; Substantial Completion and Final Completion process and paperwork. 3. Construction Special Testing Services Also required under this phase is complete special testing services typically provided for construction projects. Services shall include but not necessarily limited to: assisting the Construction Manager, Architect and contractor in development and implementation of a Quality Assurance Plan for the project; provide all testing including structural testing and specialized inspections as required by the current California Building Code; provide all soils analysis, compaction testing and excavation inspections as required by the current California Building Code; provide certification of building pad following rough grading; provide concrete testing and inspection, concrete mix design review, concrete placement inspection sampling and cylinder testing; rebar reinforcement inspection, ties, overlaps and clearance requirements; steel fabrication, welding, bolt testing and inspection; perform specified inspection, sampling, and testing of products in accordance with specified standards and report all compliant and non-compliant test findings; ascertain compliance of materials and mixes with requirements of Contract Documents; attend pre construction meeting and progress meetings, when requested; and prepare, cure, store, and transport project samples to the laboratory as required and in compliance with specified standards.
Mikah Salsi
Login or create an account
Login or create an account
Owner: Sewerage Commission-Oroville Region (SC-OR) CA
Published 09/20/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.