Norino Drive Water Transmission Line Sliplining, Whittier, CA

Los Angeles County

Owner Reference: 24-014

Bid Date: 02/04/2025 at 11:00am
72 Days until bid date

Pre-Bid: 01/07/2025 @ 11:00am

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The work to be performed consists of HDPE slip lining the existing 24” concrete water transmission line, in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2018 Edition. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee excavation permit(s) for the project from the City of Whittier, Public Works Department. Bonds required. Prevailing wages.

Public Works
 Login or create an account
 Login or create an account

Owner: City of Whittier CA

Published 11/18/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.