9510 Brighton Way Seismic Upgrade - Phase 1 Fire Sprinkler, Beverly Hills, CA

Los Angeles County

Owner Reference: 25-350-10, BPG-003

Bid Date: 12/11/2024 at 02:00pm
17 Days until bid date

Pre-Bid: 11/26/2024 @ 08:00am

Trades: C16 - Fire Protection Systems, Fire Alarm & Fire Suppression Contractor, Fire Pumps & Fire Hydrants

Scope of Work shall be as described and in accordance with drawings and technical specifications prepared by Brandow & Johnston Structural & Civil Engineers, Dated November 15, 2024; The Project includes, without limitation, remove and temporary relocate sprinkler riser and partial mainline to allow for construction of a new concrete shear wall, re-install the riser and partial mainline after construction of the wall. Refer to drawings for additional pertinent information. Fire Sprinkler modifications shall be design-build, fire sprinkler contractor shall secure fire departments approval. Pre-qualification required. Bonds required. Prevailing wages.

Karen Domerchie
 Login or create an account
 Login or create an account

Owner: City of Beverly Hills CA

Published 11/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.