ID 723624
San Diego County
Owner Reference: K-25-2276-DBB-3-A
Bid Date: 11/18/2024 at 02:00pm
Pre-Bid: 10/01/2024 @ 09:00am
Estimate: $2,160,000
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Construction of Mountain View Improvement 1 consists of approximately 171 linear feet (0.03mi) of 12-in VC sewer mains to replace existing 10-in VC sewer mains via open trench. Also, the construction of approximately 669.76 linear feet (0.126 mi) of new 8 and 12-in sewer main, including new manholes via open trench. Abandon approximately 492 linear feet (0.09 mi) of sewer main. Scope of work also includes the Long-Term Maintenance and Monitoring Agreement. Construction of Valencia Park Improvement 4 consists of the replacement of approximately 0.12 mile of existing 8"ac water main, abandonment of 0.07-mile 0f existing 8" ac water main and transfer 3 - 1" water services on 54th st to the adjacent 12"pvc. The replacement of approximately 0.12 mile of existing 6" vc sewer main. The rehab of one manhole abandonment of 0.09 mile of existing vc sewer main, water services, sewer lateral. Bonds required. Prevailing wages.
Abel Martinez
Login or create an account
Login or create an account
Owner: City of San Diego CA
Published 09/24/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450