ID 731968
San Diego County
Owner Reference: 104317
Bid Date: 01/10/2025 at 02:00pm
48 Days until bid date
Pre-Bid: 12/06/2024 @ 02:00pm
Estimate: $3,033,739
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The scope of work is to complete concrete joint seal improvements along Taxiways B and B1 at San Diego International Airport. Specific tasks include removal and replacement of distressed concrete pavements and joint seals; asphalt shoulder pavement rehabilitation, adjacent to Taxiway B; and installation of new and refreshed pavement markings. All design documents have been developed per current FAA and Authority design standards. Bonds required. Prevailing wages.
Missy Mcgrath
Login or create an account
Login or create an account
Owner: San Diego County Regional Airport Authority (International Airport (SAN) CA
Published 11/22/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.