ID 730255
Yolo County
Owner Reference: CIP 19-13
Bid Date: 12/05/2024 at 02:00pm
12 Days until bid date
Trades: Traffic Signals, Traffic Calming, Control & Monitoring - Electrical & General Engineering Contractor, C32 - Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The project will realign the northbound SR-113 off-ramp at Gibson Road by removing the free right turn ramp and aligning the off-ramp movement to utilize the traffic signal. A new pedestrian crosswalk will be added on the east leg of the intersection and the existing traffic signal and lighting system will be modified for the changes at the intersection. Other project improvements include widening over the existing drainage ditch between SR-113 and Harry Lorenzo Avenue to construct a new curb & gutter, a planter strip, a multi-use pathway, and a landscape buffer behind the new sidewalk. The project will also install new pedestrian streetlights along Gibson Road. The successful bidder must possess a current, valid Class A, General Engineering Contractor’s License issued by the State of California. Bonds required. Prevailing wages.
Purchasing
Login or create an account
Login or create an account
Owner: City of Woodland CA
Published 11/12/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.