ID 724252
Jefferson County
Owner Reference: RFP 6242
Bid Date: 10/25/2024 at 12:00pm
Pre-Bid: 10/08/2024 @ 12:00pm
Trades: Solar Photovoltaic (PV) Contractor, CO-01 - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
. The Contractor shall conduct a pre-design and pre-construction walk at the Site to identify any potential issues (i.e., trees, irrigation, etc.) that impact design and construction activities. In addition, the Contractor shall identify and document existing conditions and/or damage at the Site. The Contractor shall not be responsible for upgrading and/or repairing areas of the Site with existing damage unless such work is explicitly included in the approved Design Submittal Package. b. The Contractor is responsible for all handling of equipment including material unloading, lifting, and mobilizing as required to complete the work. The Contractor shall determine required delivery dates according to construction schedule. c. The Contractor is responsible for keeping the construction area clean, and removing all construction related debris, trash, and recyclables, including but not limited to, module packaging. d. The Contractor shall coordinate site access, site staging areas, permissible storage areas, permissible parking areas, and hours of operation for subcontractors. e. The Contractor shall protect all existing finish work from damage during mobilization, installation and demobilization. Should the Contractor cause damage to any property of the Site, the Contractor is responsible for curing damage. f. All temporary rest rooms, power, and potable drinking water for the site are the responsibility of the Contractor. g. All temporary fencing, barricades, signage, secured containers, and other forms of protection as required to protect personnel, general public and all equipment from injury or damage during construction will be the responsibility of the Contractor. h. If hazardous materials are encountered during construction, the Contractor will immediately stop work in the area affected and report the condition to the City. i. The Contractor shall provide legal offsite disposal for all construction waste resulting from this Scope of Work and recycle all waste materials, where possible, including metal and concrete. j. The Contractor shall provide project management, scheduling, oversight, and quality control procedures associated with its scope throughout project duration. k. Work hours will comply with local ordinances however it is assumed that work may proceed between 7am and 9pm on Monday through Saturday (City holidays excepted). l. The Contractor will ensure that any dysfunctional solar panels not returned to the manufacturer and needing disposal will be recycled by a qualified recycling vendor. m. Xcel Energy (“Utility Provider”) is the Utility Provider for the City of Lakewood. Bonds required. Prevailing wages.
Kevin Goggin
Login or create an account
Login or create an account
Owner: City of Lakewood CO
Published 09/28/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.