Lincoln Road Improvement Project - Phase 2 (Meridian Ave), Miami Beach, FL

Miami-Dade County

Owner Reference: 2025-087-ND

Bid Date: 12/16/2024 at 03:00pm
23 Days until bid date

Pre-Bid: 11/15/2024 @ 02:00pm

Estimate: $8,300,000

Trades: CGC - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , CU - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, *Landscaping Contractor: Grounds Maintenance Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping

This ITB is only for the construction work associated with the Meridian Avenue improvements. Meridian Avenue improvements included infrastructure work which may include water main, force main, and drainage installations. Above ground improvements may include concrete pavers, street lighting, landscaping, irrigation, paving and stripping from Lincoln Lane South to 17 th St. Bonds required.

Natalia Delgado
 Login or create an account
 Login or create an account

Owner: City of Miami Beach FL

Published 10/31/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.