ID 727757
Edgar County
Owner Reference: 91630 | FM3U(794)
Bid Date: 11/08/2024 at 12:00pm
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S
This project consists primarily of the removal and replacement of PC Concrete Sidewalk in the three locations listed above, which will help to connect Carolyn Wenz Elementary School, Paris Mayo Middle School, and Allen Memorial Field. These locations will also include removal and replacement of Concrete Curb and variable depth HMA surface removal to provide ADA conforming access. Various other items are also included, such as inlets to control drainage, culvert removal and replacement, seeding, and all other items to complete the construction. DBE 1%. Bonds required. Prevailing wages.
IDOT Contracts Office
Login or create an account
Login or create an account
Owner: State of Illinois Department of Transportation (ILDOT) IL
Published 10/23/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450