ID 728834
Clark County
Owner Reference: 2024-10
Bid Date: 11/12/2024 at 11:00am
Pre-Bid: 10/15/2024 @ 01:00pm
Estimate: $1,900,000
Trades: C31 - Demolition Contractor, Building Moving, Wrecking & Hauling, Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The project is located at 1800 W Charleston, Las Vegas, NV 89102. The tenant improvement area is a 26,310 sq. ft. space. It is located on the 1st floor and consists of the Main Hospital Lobby, “The Middle,” and adjacent corridors. The scope includes the demolition of the existing Security and Information Desk of the Main Hospital Lobby and the demolition of existing lighting throughout corridors. A new information desk and security desk in new locations within the lobby are to be constructed. Artificial trees are to be removed. New desk and lighting at the area referred to as “The Middle” are to be provided. New LED lighting in the corridors is to be provided. Bonds required. Prevailing wages.
Fred Parandi
Login or create an account
Login or create an account
Owner: University Medical Center of Southern Nevada / University Medical Center (UMCSN) NV
Published 10/31/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.