ID 726631
Bell County
Owner Reference: 49032-297961
Bid Date: 11/20/2024 at 02:30pm
Pre-Bid: 10/16/2024 @ 02:30pm
Estimate: $1,055,000
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Industrial Painting & Coating Contractor: General Engineering Contractor (Includes Graffiti Removal), *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The project consists of replacing/rehabilitating pipe supports, recoating filter gallery pipes, and repairing wall cracks within the filter galleries. Bonds required. Prevailing wages.
Erica Wellen c/o CDM Smith
Login or create an account
Login or create an account
Owner: Bell WCID1 Water Control & Improvement District TX
Published 10/15/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.