**NEW BID DATE**2024 All Purpose TOC Package 2, San Antonio, TX

Bexar County

Owner Reference: 23-03870-02

Bid Date: 12/03/2024 at 02:00pm
9 Days until bid date

Pre-Bid: 10/21/2024 @ 10:00am

Estimate: 9,955,170.00

Trades: Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors - General Engineering Contractor, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Stone Masonry Contractor: Block Wall, Chimneys, Retaining Walls, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, *Landscaping Contractor: Grounds Weed Control Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping, Non-Electrical Signs & Signage Contractor: Interior Advertising or Wayfinding, Tree Service Contractor: Trimming/Pruning Trees, Stump & Tree Removal/Rooting/Grinding, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Project construction may include but is not limited to: full depth reconstruction, lime/cement treatment of existing subgrade, base installation and surface course installation, pavement markings, speed hump(s), milling, concrete curbs, sidewalks, midblock crosswalks, pedestrian safety island(s), high‐intensity activated crosswalk(s), driveways, concrete retaining walls‐combination type, storm drain inlets/pipes, channel grading, erosion control, storm water velocity control, concrete bus pads, wheel chair ramps, removing and relocating mail boxes, topsoil, sodding, signage, striping, elevated sidewalks, sidewalk pipe railing, pedestrian beacons, traffic signal(s), pedestrian bridge installation with abutments, concrete structures, adjusting existing meter boxes, valve boxes and manholes, tree pruning, removal and/or replacement, and any other items required due to the site conditions to accomplish the project scope. Bonds required. Prevailing wages.

Desiree Alderete
 Login or create an account
 Login or create an account

Owner: City of San Antonio TX

Published 10/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.