New Parking Structure & Ground Transportation Center (GTC), San Antonio, TX

Bexar County

Owner Reference: 2025-012

Bid Date: 01/07/2025 at 10:00am
45 Days until bid date

Pre-Bid: 11/22/2024 @ 09:00am

Estimate: $110,000,000.00 (Not to exceed $125,000,000 total program cost)

Trades: Design/Build Contractor; Design/Bid/Build Entity (DBBE), *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors

The City of San Antonio solicits qualifications for Design-Build Services for a new parking structure and ground transportation center (GTC). This is a High-Profile solicitation. D-B shall provide, but not limited to: • Complete, permittable, and constructable construction documents developed from the preliminary RFQ bridging documents. • All project management, architectural, engineering, cost management, permitting (including costs), project design and construction schedule, and other such pre-construction services required for the successful completion of the Project. • Identify a fair process to facilitate and expedite design review to enhance schedule with City and stakeholders. • Identify project specific risks, clearly identify how such risks are mitigated, and maintain a risk register hosted within City’s Project Management Information System (PMIS) platform. D-B shall allocate the risk to each party best suited to address the risk. • Identify sustainable design opportunities. • All quality management controls, and monitoring needed for a successful project, including quality assurance and quality control of both design and construction phases of the project. • All construction management and supervision, general conditions for construction, construction services for all required trades, including all labor, materials and equipment required for a complete and workable Project. • Maintain compliance with all applicable prevailing wage laws/Davis Bacon Laws. • Systems commissioning, operational readiness, performance requirements validation, Project Substantial Completion, Final Completion, close-out, and warranty follow-up services.. The City will develop a shortlist from responses, hold interviews and anticipate selection and negotians by April, 2025.

Adrian Pena
 Login or create an account
 Login or create an account

Owner: City of San Antonio TX

Published 11/10/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.