Wastewater Treatment Plant Outfall Replacement, Houston, TX

Harris County

Owner Reference: 070127

Bid Date: 11/19/2024 at 10:30am

Pre-Bid: 11/12/2024 @ 10:30am

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station

Remove and replace approximately 130 LF of effluent pipe at the WWTP within HCFCD ditch. Bonds required. Prevailing wages.

Darla Dewar
 Login or create an account
 Login or create an account

Owner: El Dorado UD Utility District TX

Published 11/06/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.