ID 730217
Harris County
Owner Reference: 3432-1101D
Bid Date: 12/04/2024 at 02:30pm
11 Days until bid date
Pre-Bid: 11/14/2024 @ 02:30pm
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Construction of the Water, Sanitary Sewer, Force Main, Drainage and Detention Facilities to Serve Enclave at Newport Section 1. Bonds required. Prevailing wages.
Steven Perez, P.E.
Login or create an account
Owner: Newport MUD Municipal Utility District TX
Published 11/11/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.