WHCMUD No. 9 Waterline Rehabilitation Phase 2 to serve Winchester Country Trails Sections 1 & 2, Houston, TX

Harris County

Owner Reference: 78029-20-56 (L)

Bid Date: 12/03/2024 at 01:00pm
10 Days until bid date

Pre-Bid: 11/26/2024 @ 01:00pm

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Project scope shall include proposed waterline rehabilitation by pipe bursting. Bonds required. Prevailing wages.

EHRA Engineering
 Login or create an account

Owner: Harris County MUD9 Municipal Utility District TX

Published 11/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.