Water Plant No. 2 and Water Well No. 7 Recoating, Houston, TX

Harris County

Owner Reference: 24170-125-10062-000

Bid Date: 12/03/2024 at 01:00pm
10 Days until bid date

Pre-Bid: 11/19/2024 @ 01:00pm

Trades: Tank Services: Installation & Cleaning, Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor, Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor, Mechanical Insulation & Acoustical Contractor: Energy Level Management, Sound or Noise Reduction & Temperature Control, Sand & Water Blasting Contractor; Hydroblasting, Pressure Washing, Street Power Washing Services, Industrial Painting & Coating Contractor: General Engineering Contractor (Includes Graffiti Removal), *Landscaping Contractor: Grounds Weed Control Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping

Work of the contract is for the Interior and Exterior Recoating of the Water Plant No. 2 Ground Storage Tank Nos. 1 & 2, the replacement of both Water Plant No. 2 Ground Storage Tank roofs, Water Well No. 7 Ground Storage Tank No. 1, and all above ground piping and appurtenances; located in northeast Clear Lake City at 4223 Manorfield Drive, Seabrook, Texas 77586 and 4002 Bay Area Boulevard, Houston, Texas 77058 respectively. See Key Map No.s 618D and 619G. The ground storage tanks are all welded steel water tanks. In general, this work consists of: 1. Installation of temporary sound walls including supervision, labor, materials, tools, equipment, and maintenance; around project sites designed to withstand suitable wind loads and sealed by a qualified professional engineer licensed in the state of Texas. 2. Surface preparation of the interior surfaces of the three ground storage tanks, including abrasive blasting to near-white metal cleanliness, and removal and surface preparation of the air vents; Coating of the wet interior surfaces including the wet interior piping, ladder, and air vents. 3. Surface preparation of the exterior surfaces of the three ground storage tanks including abrasive blasting to near-white metal cleanliness and 100 percent containment; Coating of the exterior surfaces including the riser pipe and roof hatch access manways, the air vents, and a non-skid coating on the roof of the tank. 4. Surface preparation and coating of all aboveground yard piping and appurtenances. 5. Replacement of Water Plant 2 Ground Storage Tank Nos.1 & 2’s roof plates and rafters, sidewall attachment areas, center halo fill line attachment brackets, overflow structure, top section of interior ladders, roof vents, and power ventilators. 6. Installation of additional hatches above the Water Plant 2 Ground Storage Tank Nos.1 & 2’s overflow system. 7. Installation of handrail systems to the exteriors of Water Plant 2 Ground Storage Tanks Nos.1 & 2. 8. Disinfection, site restoration to include sodding of disturbed areas, and site cleanup. Bonds required. Prevailing wages.

Jacob Blasch c/o Lockwood, Andrews & Newnam, Inc. (LAN)
 Login or create an account
 Login or create an account

Owner: Clear Lake City Water Authority TX

Published 11/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.