Access to Navarro Mills Lake Road, Dawson, TX

Navarro County

Owner Reference: 6982AF23B000037m, TX FLAP FM 709(1)

Bid Date: 10/30/2024 at 02:00pm

Estimate: $5.0M - $10.0M

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

237310 - Highway, Street, and Bridge Construction. The proposed improvements are for 3R rehabilitation to rehabilitate 3.8 miles of FM 709. The roadway provides access to the Navarro Mills Harbor Marina and the Dam Road. The improvements begin approximately at intersection SH 31 in the City of Dawson and ends at the Liberty Hill Park junction. The proposed project is anticipated to be full depth reclamation, shoulder widening, and asphalt concrete pavement (ACP). In addition, the project will add guardrail, replace bridge transition rail, guardrail end terminals, mow strips, extend or replacement culverts and install safety end treatments to drainage structures. The roadway will be widened to 11-foot lanes and 3-foot shoulders. Signing and pavement markets and rumble strips will be included to improve safety. Bonds required. Prevailing wages.

Stephanie Navarro, email only
 Login or create an account
 Login or create an account

Owner: US Department of Transportation (USDOT) CO

Published 10/12/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.