Plano West Side 36-Inch Pipeline (Plano Delivery Point No. 3 to Richardson Delivery Point No. 2) Water Line B, Wylie, TX

Rockwall County

Owner Reference: 101-0566-20

Bid Date: 11/13/2024 at 02:00pm

Pre-Bid: 10/09/2024 @ 09:00am

Estimate:  $15M - $25M.

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The North Texas Municipal Water District (NTMWD) is soliciting bids from qualified vendors for Plano West Side 36-inch Pipeline (Plano Delivery Point No. 3 to Richardson Delivery Point No. 2). This project is generally located at along Custer Road in the Cities of Plano and Richardson. Project includes construction of approximately 9,100 linear feet of 36-inch water transmission main along Custer Road between the intersection of Custer Road and Renner Road and Plano Delivery Point No. 3 Bonds required. Prevailing wages.

Troy Benton
 Login or create an account
 Login or create an account

Owner: North Texas MUD Municipal Water District (NTMWD) TX

Published 09/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.