ID 727740
Jefferson County
Bid Date: 11/13/2024 at 02:00pm
Estimate: $1.9M - $$2.25M
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
The project includes extending the City’s existing Monroe Lift Station force main by approximately 1,850 linear feet via horizontal directional drilling and open-cut and replacing approximately 1,830 linear feet of existing gravity sewer main via sliplining along Water Street. The work also includes traffic control, temporary sewer bypasses, manhole rehabilitations, side sewer reinstatements, abandonment, restoration, and coordination with the City for construction sequencing. Bonds required. Prevailing wages.
Andre Harper
Login or create an account
Login or create an account
Owner: City of Port Townsend WA
Published 10/23/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.