ID 726998
Kitsap County
Bid Date: 11/07/2024 at 01:00pm
Pre-Bid: 10/24/2024 @ 01:00pm
Estimate: $3.9M - $4.1M
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Work consists of asphalt pavement repair, asphalt planing, fiber reinforced HMA pavement overlay, ADA ramps demolition and reconstruction, installation of new water main line with service connection, abandonment of existing water main, stormwater system modifications, combined sewer overflow separation, demolition of existing and installation of a new traffic signal with vehicle detection systems, pavement marking, signing and traffic control. Mandatory DBE goal 10% Bonds required. Prevailing wages.
Chris Dimmitt
Login or create an account
Login or create an account
Owner: City of Bremerton WA
Published 10/17/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450