ID 726348
Lewis County
Bid Date: 11/05/2024 at 11:00am
Estimate: $1.4M - $1.6M
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The work consists of constructing a 450,000-gallon stainless steel bolted reservoir including demolishing the existing Fabritank reservoir and concrete reservoir, site work, site piping, site restoration, electrical, instrumentation, and telemetry. Bonds required. Prevailing wages.
Mike Johnson
Login or create an account
Login or create an account
Owner: Boistfort Valley Water District WA
Published 10/14/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.