ID 19506
Date Of Advertisement From Dec 02, 2024 to Feb 08, 2025
An Equal Opportunity Employer
is requesting quotations from all qualified
DBE
sub-contractors and/or material suppliers for the following project:
Reference: H14646
GLEN HELEN PARKWAY BRIDGE OVER CAJON WASH
Located in San Bernardino County, CA
Owner: SAN BERNARDINO COUTY
Bid Date: 01/09/2025 at 11:00AM
We are requesting bids for the following trades and/or material suppliers:
PIPE SUPPLIER, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CLEARING & GRUBBING, TREE REMOVAL, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, PLANTING/LANDSCAPING, IRRIGATION SYSTEM, TEMPORARY EROSION CONTROL, AGGREGATE BASE, ASPHALT CONCRETE PAVING, FURNISH & DRIVE PILING, CAST-IN-DRILLED-HOLE CONCRETE PILING, PRESTRESSING CONCRETE CAST-IN-PLACE, CONCRETE STRUCTURE, MINOR CONCRETE STRUCTURE, JOINT SEAL, REINFORCING STEEL, ROADSIDE SIGN,
PAINTING/COATINGS, REINFORCED CONCRETE PIPE, CONCRETE CURB/GUTTER/SIDEWALK/RAMP-MISC, MISC. IRON & STEEL FRAME, COVER & GRATE, MISC. BRIDGE METAL, FENCING, METAL RAILING, CONCRETE BARRIER, PAVEMENT MARKING & STRIPING, SIGNAL & LIGHTING, SWPPP PLANNING, SUPER 10 DUMP TRUCK,
WATER TRUCK, STREET SWEEPING TRUCK, DEMOLITION,
NAICS:
237110, 237310, 238110, 238120, 238210, 238320, 238910, 238990, 332312, 332323, 423510, 484220, 488490, 541330, 561730
Bid documents can be viewed at or obtained from:
Plans and Specifications are available free of charge at https://stevepradosinc.sharefile.com/d-se285727b5fc34ee3a428cbf1db399bc8 And also available for viewing at 2002 E. McFadden Ave., Ste. 200, Santa Ana, CA 92705 call our office to schedule a review of the plans and specifications (714) 835-4612.
S.P. Rados, Inc. is a Signatory Union Contractor. Subcontractors will be required to abide by the terms and conditions of the AGC Standard Long Form Subcontract incorporating prime contract terms and conditions, including payment provisions & insurance requirements. S.P. Rados, Inc.’s listing of a subcontractor is not to be construed as an acceptance of all the subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Subcontractors will be required to provide a payment & performance bond from an approved surety company for 100% of the subcontracted work. S.P. Rados, Inc. will pay bond premium up to 1.5% (optional).
Please be advised, Contractors and Subcontractors must register with the D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with the D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify status of your D.I.R. number, please visit: http://.dir.ca.gov/Public-Works/Contractors.html.
Assistance is available in obtaining bonds, lines of credit and/or insurance. We will consider dividing total requirements when economically feasible into smaller tasks or quantities to permit participation by DBE in the competitive process. We will assist in obtaining necessary equipment, supplies, materials & related assistance or services. S.P. Rados, Inc. requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.
Steve P. Rados, Inc.
2002 E McFadden Ave., Ste. 200
Santa Ana,
CA 92705
Phone:
(714) 835-4612
Fax:
Email: bid@rados.com
Noe Guerrero
Published Dec 02, 2024 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: 1-888-786-9450 Fax: 209.772.3573
This solicitation Ad will be archived 30 days after the bid date