ID 19578

Date Of Advertisement From Nov 25, 2024 to Jan 11, 2025

Steve P. Rados, Inc.

An Equal Opportunity Employer
is requesting quotations from all qualified
DBE, MBE, WBE
sub-contractors and/or material suppliers for the following project:

HERONDO STEET PUMPING PLANT FORCE MAIN UPGRADES

Located in Los Angeles County, CA

Owner: Los Angeles County Sanitation Districts

Bid Date:  12/12/2024 at 02:00PM

We are requesting bids for the following trades and/or material suppliers:

PIPE SUPPLIER, TRAFFIC CONTROL MATERIALS, TRAFFIC CONTROL SYSTEM, ASPHALT CONCRETE PAVING, MINOR CONCRETE STRUCTURE, REINFORCING STEEL, PAINTING/COATINGS/LININGS, SEWER MANHOLE, CONCRETE CURB/GUTTER/SIDEWALK/RAMP-MISC, MISC. IRON & STEEL FRAME, COVER & GRATE, TEMPORARY FENCING, PAVEMENT MARKING & STRIPING, ELECTRICAL AND INSTRUMENTATION, SWPPP PLANNING, TRAFFIC CONTROL PLANS, SUPER 10 DUMP TRUCK, WATER TRUCK, STREET SWEEPING TRUCK, HAZARDOUS SUBSTANCE REMOVAL, HAZARDOUS WASTE TRUCKING, DEWATERING, SEWAGE BYPASS, POTHOLING, VAULT HATCHES, PUMPS

 

NAICS:

237110, 237310, 238110, 238120, 238210, 238320, 238910, 238990, 332323, 332999, 423510, 423830, 423990, 484220, 488490, 541330, 562112 


Bid documents can be viewed at or obtained from:

Plans and Specifications are available free of charge at: https://stevepradosinc.sharefile.com/d-sb29339d5be7540cc8b6d2f6bab68071c And also available for viewing at 2002 E. McFadden Ave., Ste. 200, Santa Ana, CA 92705 call our office to schedule a review of the plans and specifications (714) 835-4612. 


S.P. Rados, Inc. is a Signatory Union Contractor. Subcontractors will be required to abide by the terms and conditions of the AGC Standard Long Form Subcontract incorporating prime contract terms and conditions, including payment provisions & insurance requirements.  S.P. Rados, Inc.’s listing of a subcontractor is not to be construed as an acceptance of all the subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Subcontractors will be required to provide a payment & performance bond from an approved surety company for 100% of the subcontracted work.  S.P. Rados, Inc. will pay bond premium up to 1.5% (optional). 

 

Please be advised, Contractors and Subcontractors must register with the D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with the D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify status of your D.I.R. number, please visit: http://.dir.ca.gov/Public-Works/Contractors.html.

 

Assistance is available in obtaining bonds, lines of credit and/or insurance. We will consider dividing total requirements when economically feasible into smaller tasks or quantities to permit participation by DBE, MBE, WBE in the competitive process. We will assist in obtaining necessary equipment, supplies, materials & related assistance or services. S.P. Rados, Inc. requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.



Steve P. Rados, Inc.
2002 E McFadden Ave., Ste. 200
Santa Ana, CA 92705

Phone: 916-475-1654  Fax:
Email: bid@rados.com
Lucy Gonzalez

Published Nov 25, 2024 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: 1-888-786-9450 Fax: 209.772.3573

This solicitation Ad will be archived 30 days after the bid date