Main Wastewater Treatment Plant Secondary Clarifier Rehabilitation Phase 4, Oakland CA

Alameda County

Owner Reference: SD459

Bid Date: 10/02/2024 at 01:30pm

Pre-Bid: 09/18/2024
The District will conduct a pre-bid jobsite inspection tour to familiarize prospective bidders with the project site and conditions. Attendees will be required to sign a waiver prior to entering the project site. See Appendix A for waiver. Bidders/bid walk attendees (Attendees) shall comply with the Alameda County health orders. Face coverings will be required at a facility is if there is a declared Cal-OSHA Outbreak at the project site (applicable signs indicating as such will be posted). Attendees shall also cover their coughs/sneezes, practice hand washing, and shall not engage in physical contact. Attendees who disregard these health and safety requirements, as well as attendees who feel sick and/or have a cough or fever will not be allowed to attend. Attendees shall assemble at The Main Wastewater Treatment Plant at 2020 Wake Ave, Oakland. This is the only time that the work site will be open for inspection. The inspection will last approximately 2 hours. Attendees are encouraged to wear non-skid shoes. No photography by the Attendees will be allowed. The District will take photographs, as requested by the Attendees, restricted to the work zone. The District will release photographs to Attendees after the bid walk, pending review by District. All Attendees are required to have a photo ID and sign a confidentiality agreement not to share, sell, or publish photos. The Prime Contractor and its subcontractors are strongly encouraged to attend the jobsite inspection where a "sign-in" sheet will be provided. Requirements of the District's Contract Equity Program, including the Local Hire component, will be discussed and explained at the jobsite inspection.

Estimate: $6,500,000 to $8,000,000

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

Work includes: (1) Rehabilitating Clarifiers 4 and 11 by replacing the clarifier equipment, refurbishing the bridge, resurfacing the concrete surfaces, rebuilding drives, refurbishing influent gates, and replacing electrical equipment, (2) installing new sump pits at 5 clarifiers, (3) installing new sump pumps at 6 clarifiers, (4) providing new 120V, 208V, and 480V and control wiring for Clarifiers 8, 11, and 12, (5) inspecting clarifier return activated sludge pipeline and providing Cure-In-Place Piping rehabilitation if required for 2 clarifiers, (6) inspecting the closed conduit secondary effluent channel, (7) regrading and replacing the soil adjacent to the clarifiers with new material, and (8) replacing actuators on the influent gates at 8 clarifiers. Bonds required. Prevailing wages.

East Bay Municipal Utility District (EBMUD) CA
 Diego Lucen

Published 08/20/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.