NEW BID DATE: Pump Station H Rehabilitation Phase 2, Oakland CA

Alameda County

Owner Reference: SD444

Bid Date: 11/13/2024 at 01:30pm

Pre-Bid: 10/01/2024 @ 01:00pm

Estimate: $9,6000,000 to $11,100,000

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Work includes replacement of existing equipment and modification of existing infrastructure, including: replacement of main sewage pumps (furnish and install two pumps and furnish one spare), cone valve, effluent gate valve, flow meter, sluice gates, and air compressors; design, testing, installation, and operation of a temporary pump station bypass system; hot tap connection to the existing force main including cathodic protection, excavation, shoring, dewatering, underpinning, backfill, and pavement restoration work; security camera installation; mortar lining and protective coatings work on the discharge header and influent channels; hydraulic oil actuator system and crane rehabilitation; roof handrail installation; piping modifications throughout the building; miscellaneous coating work; associated structural, piping, electrical, and instrumentation work; and all other work as shown in the Contract Documents. Bonds required. Prevailing wages.

Dimitri Araica
 Login or create an account
 Login or create an account

Owner: East Bay Municipal Utility District (EBMUD) CA

Published 09/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.