Cary and Vinland Park Improvements, Fresno, CA

Fresno County

Owner Reference: 12500602

Bid Date: 10/15/2024 at 03:00pm
24 Days until bid date

Pre-Bid: 09/24/2024 @ 10:00am

Estimate: $500,453

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, C27 - *Landscaping Contractor: Grounds Maintenance Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping, D34 - Mobile Home & Prefabricated Buildings, Playgrounds, Modular Units & Structures, Shelters, Portables, Portable Toilets: Setup & R

The scope of work includes but is not limited to; improvements at Cary Park and Vinland Park. Cary Park scope of work involves installation of new park bench(es), waste receptacle(s), Measure P signage, ADA compliant deepened concrete playground curb and concrete edge, removal of existing playground equipment, removal and replacement of existing wood mulch surfacing with poured-in-place rubber surface subgrade and accessibility improvements. Vinland Park scope of work involves installation of new park bench(es), waste receptacle(s), Measure P signage, shade sail structure, shade trellis, ADA compliant deepened concrete playground curb, and accessibility improvements. Bonds required. Prevailing wages.

James Jackson
 Login or create an account
 Login or create an account

Owner: City of Fresno CA

Published 09/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.