ID 719489
Los Angeles County
Owner Reference: 138
Bid Date: 10/15/2024 at 10:00am
Pre-Bid: 08/27/2024 @ 10:00am
Estimate: $1,056,200
Trades: C10 - High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, C7 - Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet
Install campus side fire alarm system and IT infrastructure upgrades, including, but not limited to: Install new conduit system; Using a combination of new and existing conduit system, install new fiber optic cable from a central location to new patch panels at nine existing buildings at the Expo Center; Remove existing fire alarm devices and install new fire alarm devices in nine existing buildings; Test and make complete fire alarm system functional and monthly for three years; Support, including NICET3 License, in obtaining fire department approval and permit; IT infrastructure upgrades to include new conduits and fiber optic cable from the central location to patch panels in each of the nine existing buildings and other related work. Contractor shall have previous experience in performing similar work in the installation of fire alarm systems. Bonds required. Prevailing wages.
James Cramsie
Login or create an account
Login or create an account
Owner: City of Industry CA
Published 08/26/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.