ID 724153

Archived

BID DATE CHANGE - Kerner Redevelopment, San Rafael CA

Marin County

Owner Reference: 3010-3020

Bid Date: 11/01/2024 at 02:00pm

Pre-Bid: 09/30/2024
A NON-MANDATORY in person or virtual pre-proposal conference will be held for this project. Following the pre-proposal conference there will be a site walk. Those wishing to attend must RSVP via email to lgradia@marintransit.org by September 30, 2024 at 9 am. A link and call-in information will be sent to all parties that RSVP to participate.

Estimate: $2,800,000

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Terminal Charging: Electric Vehicle Charging Stations (EVCS); Battery Electric Bus (BEB) & Zero Emissions Vessels (ZEV) or Ferri, C7 - Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet, C46 - Solar Photovoltaic (PV) Contractor, D3 - Awning Contractor: Canopies, Carports, Shade Structures, Patio Covers, Pergolas, Arbors, Trellises, & Soffit, C13 - Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron

The primary construction components will be construction of a new parking lot including a solar canopy, fencing and electric vehicle charging on a 0.97 acre lot in the City of San Rafael (City). The construction will include new lighting, a back up battery storage system connected to 3000 Kerner and new landscaping. Bonds required. Prevailing wages.

Marin Transit (Marin County Transit) CA
 Purchasing

Published 09/27/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.