ID 722778
Orange County
Owner Reference: 017- 2684602-TT-OCIT
Bid Date: 10/17/2024 at 02:00pm
Pre-Bid: 09/25/2024 @ 10:00am
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C7 - Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet
The County of Orange, Orange County Information Technology (OCIT) is requesting competitive sealed bids from qualified Contractors for Terminal A and C Fiber Cabling Installation for John Wayne Airport (JWA). Contractor shall perform all work as required by, and in strict accordance with, the Contract Documents, which consists of the following: Install Single Mode Fiber cable from the Lighting Vault to the North Telcom RM. The SM fiber will terminate to SM-LC splice Corning cassettes and be housed in new Corning enclosures. The SM fiber will go to existing cabinets in the Lighting Vault and Terminal A Server room. Work to include Corning rack mount enclosure, Corning splice cassettes, Misc. Mat tape, Velcro, labels, tie wraps, fiber tags, and rope. Install Single Mode Fiber cable from the North Telcom Rm to the Terminal A Server Room and Terminal C MDF (1073). The SM fiber will terminate to SM-LC splice Corning cassettes and housed in new Corning enclosures. Work to include Corning rack mount enclosure, Corning splice cassettes, Misc. Ma tape, Velcro, labels, tie wraps, fiber tags, and rope. Using existing airfield pathways, install fiber cables along with a nylon rope, or pull string. Please use proper PPE when installing in the manholes or man vaults, Outside Plant cabling installation shall be the preferred type of fiber optic cabling. Please document all existing pathways and submit them to JWA for documentation purposes. Label Fiber in all accessible areas including manholes and vaults. Including the head end locations or termination points. Terminate and test fiber cables with Power Meter and turn in test results to JWA. Failed test results will not be accepted. JWA will inspect the pathway and installation of the fiber cables before the project can be closed out. Fiber Optic products shall be manufactured by Corning unless specified by the owner All Installation shall be done in conformance with ANSI/TIA/EIA 568B and BICSI installation guidelines. The contractor shall ensure that the max pulling tension of the specified fiber optic cable are not exceeded and the cable bends maintain the proper radius require the Contractor to provide, in a timely fashion, the additional material and labor necessary to properly rectify the situation. This shall also apply to any and all damages sustained to the cables by the contractor during the implementation. Bonds required.
Online Bid Portal
Login or create an account
Owner: County of Orange CA
Published 09/18/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.