ID 721174
Santa Barbara County
Owner Reference: 2024-07
Bid Date: 10/31/2024 at 02:00pm
Pre-Bid: 09/10/2024 @ 02:00pm
Estimate: $1,500,000
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
In general, the work consists of providing a new 2,250-foot long 12” diameter gravity sewer in Church Street between S. Depot Street and S. Broadway Street, two 200-foot long 8” diameter relief gravity sewers and associated sewer manholes; providing irrigation and irrigation control wire conduits for future installation of irrigation lines and control wires; re-routing of an existing 8” asbestos cement water main in the alleyway west of S. Broadway Street to accommodate construction of new sewer diversion manhole; trenching, pavement restoration, hardscape and landscape restoration where required, re-striping pavement; and all work required to fulfill the intent of the Plans and Specifications for the project and necessary to render the facility complete and operational. Bonds required. Prevailing wages.
Thomas Korman
Login or create an account
Login or create an account
Owner: City of Santa Maria CA
Published 09/08/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.