ID 727691
Santa Clara County
Owner Reference: 24-25-03
Bid Date: 10/29/2024 at 02:00pm
Pre-Bid: 10/14/2024 @ 10:30am
Trades: Class B - *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors
Although the final scope of work will be negotiated in the executed Agreement (defined below at subparagraph G) for each Project, the selected developer shall be responsible for performing the following scope of work, at a minimum: Preconstruction Services: 1. Review design and support documentation for content, constructability, completeness, scheduling, clarity, consistency, and coordination. 2. Undertake value-engineering analysis and prepare reports with recommendations to District and Architect of Record to maintain established program budget and specifications. 3. Provide detailed cost estimates. 4. Expedite design reviews, including modifications, if any, based on value analysis. 5. Provide a proposed Guaranteed Maximum Price (“GMP”) for the construction of the project with identified subcontractor bids and self-performed work. Construction Services: 1. Construction of the Project. 2. Coordination of record drawings and specifications. 3. Compilation of operations and maintenance manuals, warranties/guarantees, and certificates. 4. Obtaining occupancy permits and coordinating testing, documentation, and governmental inspections and approvals. 5. Preparation of accounting and closeout reports and occupancy plan reports. 6. Other responsibilities as necessary for the completion of the program Bonds required. Prevailing wages.
Faith Severson
Login or create an account
Login or create an account
Owner: Fremont Union High School District (FUHSD) CA
Published 10/23/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.