ID 718024
Archived
Santa Cruz County
Owner Reference: PW-0140
Bid Date: 09/13/2024 at 05:00pm
Pre-Bid: 08/26/2024
West Cliff footpath across from 2112 West Cliff Dr., Santa Cruz, CA 95060. Between Auburn Ave and Sacramento Ave.
Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, C34 - Pipeline Contractor: Water Mains, Sewer Lines, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera
The West Cliff 60-inch RCP Repair Project will stabilize the eroded slope around the 60-inch reinforced concrete pipe beneath the West Cliff Dr footpath between Auburn Ave and Sacramento Ave. The goal of this project is to prevent property loss to a public infrastructure, stabilize the eroded slope, and restore the 60-inch outfall by December 2024.
City of Santa Cruz CA
Hoi Yu
Login or create an account To view email
Published 08/16/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.