ID 720797

Archived

Jordan Gulch Sewer and Bank Stabilization, Santa Cruz, CA

Santa Cruz County

Owner Reference: 9800-005

Bid Date: 10/11/2024 at 12:00pm

Pre-Bid: 09/18/2024
Only bidders who participate in the Job Walk will be allowed to bid on the Project as prime contractors. Participants shall meet at UC Santa Cruz, Barn G 1156 High Street, Santa Cruz, CA. For further information, contact University's Representative Nathan Weiner at naweiner@ucsc.edu

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, C32 - Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, C13 - Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron - General Engineering Contractor, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment

Jordan Gulch Sewer and Bank Stabilization project includes slope stabilization through the construction of a rock-slope protected earthen embankment to project a threatened sanitary sewer line, reconstruct road with new curb, removing trees and installing a permanent fence to protect a historic limekiln.

University of California Santa Cruz (UCSC) CA
 Nathan Weiner
 Login or create an account To view email

Published 09/04/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.