ID 737658

Archived

Miles Lane Sewer Pump Station Rehabilitation, Watsonville, CA

Santa Cruz County

Owner Reference: SS-22-14798

Bid Date: 02/04/2025 at 03:00pm

Estimate: $800,000

Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

The work generally consists of replacing the existing sanitary sewer lift station with a new lift station. The major elements of the Work include: A new sanitary sewer pump station with wet well, valve vault, two 3HP pumps controls, and associated piping, 4-inch PVC force main and 8-inch gravity sewer, install owner-furnished lift station control panel automatic transfer switch and emergency standby generator, provide foundation for future propane storage tank. All bidders and contractors shall be licensed in accordance with the provisions of the California Contractor's License Law, Chapter 9 of Division 3 of the State Business and Professions Code. In addition, bidder must have at the time the contract is awarded for this project, one of the following classification(s) of contractor's license: Class A - General Engineering Contractor’s License. Bonds required.

City of Watsonville CA
 David Caneer
 Login or create an account To view email

Published 01/08/2025 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.