Temelec 1 Million Gallon tank recoating and Retrofit, Sonoma CA

Sonoma County

Owner Reference: 3031

Bid Date: 09/16/2024 at 02:00pm

Pre-Bid: 08/20/2024 @ 10:00am

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

The Work generally consists of interior and exterior surface preparation and recoating of the 1,000,000-gallon Temelec Water Tank (45ft radius, 25ft height). Modifications to the tank include: • Install 42” tall welded railings around the top perimeter of the tank from each side of the existing landing and railings. The existing railing is approximately 20 lineal feet, the remaining circumference requiring new railing is about 262 lineal feet. • Remove railing returns on existing railings (two at approximately 4’ each) • Weld 12 brackets to the top of the tank for mounting a small solar array Bonds required. Prevailing wages.

Matt Fullner
 Login or create an account
 Login or create an account

Owner: Valley of the Moon Water District (VOMWD) CA

Published 08/19/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450