ID 721610

Archived

RFQ: River Trunk Realignment River Trunk Pump Station, Modesto, CA

Stanislaus County

Owner Reference: 2024-14

Bid Date: 11/12/2024 at 11:00am

Pre-Bid: 10/03/2024
Utilities Dept., Engineering Services Division, 1010 Tenth Street, Modesto, California 95354, Suite 4600

Estimate: $95 to $115 Million

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor

The project will reroute sanitary sewer flows out of the current River Trunk Pipeline between the Gallo Winery property and the Sutter Avenue Primary Treatment Facility (SAPTF). The existing River Trunk runs adjacent to the Tuolumne River and is at risk of failure during a large storm event. The Project includes a new gravity sewer pipeline from the Gallo Property, under Dry Creek, to the new River Trunk Pump Station located at the intersection of Morton Boulevard and B Street. Sanitary sewer flow will then be pumped in a new dual forcemain, across the flood plain, to the intersection of Tuolumne Boulevard and Neece Drive. The City is currently completing construction of a new gravity pipeline from the intersection of Tuolumne Boulevard and Neece Drive to the Sutter Avenue Treatment Plant. The Project also includes new gravity pipelines to reroute flows from existing local collection pipelines to the new River Trunk Pump Station. The Owner has determined that Prospective Bidder on the Project must possess a valid State of California Class A General Engineering Contractor License at the time of submission of this SOPQ.

City of Modesto CA
 Cristian Ciotau
 Login or create an account To view email

Published 09/11/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.