ID 722345
Archived
Lee County
Owner Reference: ITB-24-15-PW-0-2024/RP
Bid Date: 10/23/2024 at 02:00pm
Pre-Bid: 09/23/2024
At 13240 Griffin Drive, Fort Myers, Florida, 33913 or join online via: tinyurl.com/FY25-LBR-Prebid. Site visit will be conducted after the pre-bid meeting.
Trades: CGC - *General Engineering Contractor GEC; Subcontractor Opportunities, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, CU - Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, *Landscaping Contractor: Grounds Maintenance Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping
Any bid received by the DISTRICT after the above date and time shall remain unopened. NOTICE IS HEREBY given that sealed bids will be received by the GATEWAY SERVICES CDD, 11922 Fairway Lakes Dr., Suite #1, Fort Myers, FL. 33913 until Wednesday, October 23, 2024 @ 2:00 P.M. EST. Bids shall be opened at approximately 2:35 p.m. the same day in the Board Chambers, 13240 Griffin Drive, Fort Myers, FL. 33913. SCOPE OF WORK: This Contract is for the restoration of the lake banks of Gateway Lakes 94 and 109 as specified herein. Restoration shall be accomplished by use of an anchor reinforced vegetation system (ARVS), non-woven geotextile, or other repair cross section as shown on the Drawings. The Work consists of furnishing all labor, all equipment, and materials (see below) required for construction, consisting of but not limited to the following: • Providing all surveying and field engineering services to establish vertical and horizontal datum and control. Staking residential lot lines, lake maintenance easement locations, and all other services necessary to complete the work as required by the contract documents. • All excavation, fill, and compaction required to establish a consistent slope along the lake as shown on the Drawings. • Installation of an ARVS and/or non-woven geotextile along the perimeter of the lake as shown on the Drawings. • Installation of Flexamat and littorals along the perimeter of the lake as shown on the Drawings. • Removing trees, landscaping, and obstruction that are within the lake maintenance easement as shown on the plans. • The contractor shall implement measures to mitigate any turbidity in the lakes caused by construction activities. This includes, but is not limited to, the application of a flocculant or other suitable chemical agents to facilitate the aggregation and settling of suspended particles, thereby reducing turbidity levels in the lake post construction. The DISTRICT will require a Bid Security/Bond and a Public Construction Bond on this project. Bonds required.
Gateway Services Community Development District FL
Randy Paniagua
Login or create an account To view email
Published 09/16/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.