ID 720287

Archived

Fox Chapel Water Main Replacement, Baltimore, MD

Baltimore County

Owner Reference: 23034 WX0

Bid Date: 10/10/2024 at 10:30am

Pre-Bid: 09/18/2024
Call 1-415-655-0001, Meeting Number 2308 019 7352## or join http://signin.webex.com/join Meeting Number 2308 019 7352#, Password PPxb3m3Dvm9

Estimate: $5m-$10m

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , *General Engineering Contractor GEC; Subcontractor Opportunities, Fire Protection Systems, Fire Alarm & Fire Suppression Contractor, Fire Pumps & Fire Hydrants

Fox Chapel Water Main Replacement: Work shall include all labor, materials, and equipment necessary to furnish and install an eight-inch and six-inch diameter ductile iron pipe water mains, including valves, valve vaults, fire hydrants, fittings, service connection renewals, pressure testing, disinfection, connection to existing water mains and appurtenances at the locations indicated on the contract drawings. MBE goal 25%. Bonds required. Prevailing wages.

County of Baltimore MD
 Barb Wentworth
 Login or create an account To view email

Published 08/30/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.