ID 718380
Archived
Lancaster County
Owner Reference: 24N01-A
Bid Date: 09/20/2024 at 02:00pm
Pre-Bid: 08/27/2024
https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZTI1NWM1ZmMtMmY3Ny00Yjc0LTk0ZWMtOTczZDc1NzE5YWQz%40thread.v2/0?context=%7b%22Tid%22%3a%22f5ca6b0d-53de-4026-a50c-02653ae42a44%22%2c%22Oid%22%3a%22adc436d5-a4b0-45ee-9c4a-ed7316572a75%22%7d
Trades: Machinery and Pumps Contractor; Motors & Variable Frequency Drives, Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's, Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing
This project includes the construction of collector well pumphouses, vertical wells, raw water transmission mains and appurtenances, and other improvements to their raw water infrastructure. The facilities will be located along the Platte River near Ashland, NE. Phase 1 will include wellhouse construction for the two collector well and will contain packages for the following trades: Earthwork, Cast in-Place Concrete, Misc. Metals, Sealants, Doors & Hardware, Coatings, Equipment Supply, Equipment Install, Hoisting Systems, Process Piping and Valves, HVAC, Plumbing, Instrumentation & Controls, and Electrical. Bonds required. Prevailing wages.
City of Lincoln NE
Ryan Adler
Login or create an account To view email
Published 08/19/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.