ID 727219
Archived
Orange County
Owner Reference: Project No. 20.24
Bid Date: 11/15/2024 at 11:00am
Pre-Bid: 10/25/2024
117 Moores Hill Road, New Windsor, New York 12553
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The City of Newburgh plans to replace the existing spillway channel walls, a portion of the spillway channel slab, and the vehicle access bridge at the spillway crest; installation steel sheet pile seepage cut-off at the spillway crest; replacement of a portion of the outlet channel wall, stabilization of a portion of the outlet channel wall, and associated site work including regrading of the embankment crest at the vehicle bridge, regrading of the embankment upstream slope and placement of supplemental riprap at the spillway channel approach, and all other work that is incidental and necessary to perform the work. As per the approved New York City Department of Environmental Protection (DEP) Land Use Permit, no work can commence prior to May 1, 2025. Bonds required. Prevailing wages.
City of Newburgh NY
Jason Morris
Login or create an account To view email
Published 10/20/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.