ID 728831

Archived

East Side Library Vertical Construction Pre-Qualification, Iron Station, NC

Lincoln County

Owner Reference: PreQualification

Bid Date: 11/26/2024 at 05:00pm

Trades: *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

J.M. Cope Inc, has been selected as the Construction Manager at Risk by Lincoln County and is seeking to prequalify construction trade and specialty contractors to submit bids for furnishing labor, materials, equipment and tools for the Lincoln County East Side Library project in Iron Station, North Carolina. Scope of work consists of +/- 22,000 sf new construction for the Lincoln County East Side Library. This includes misc. site work, landscaping, concrete, structural steel, roofing, windows and glazing, doors, frames, and hardware, drywall, paint, flooring, hard tile, acoustical ceilings, operable partitions, metal panels, fire protection, plumbing systems, HVAC systems, and electrical systems. TENTATIVE BID PACKAGES: (Vertical Construction & Final Sitework GMP#2) BP 01A – General Trades BP 01B – Final Cleaning BP 02A – Site Concrete BP 02B – Landscaping BP 02C – Site Aluminum Fence/Railings/Gates BP 03A – Cast in Place Concrete BP 05A – Structural Steel, Steel Decking, Steel Joists, Misc. Steel BP 06A – Finish Carpentry, Interior Wall Panels and Millwork BP 06B – Wood T&G Decking BP 07A – Caulking, Waterproofing, Weather Barriers BP 07B – Roofing (TPO and Standing Seam Metal Roofing) BP 07C – Fiber Cement Siding and Board & Batten Panels BP 07D – Vertical Aluminum Rain Screen System BP 08A – Interior and Exterior Storefront Glass & Glazing BP 08B – Doors / Frames / Hardware BP 09A – Non-load bearing Metal Studs & Drywall BP 09B – Hard Tile BP 09C – Acoustical Ceiling Tile and Wood Linear Ceilings BP 09D – Flooring BP 09E – Resinous Matrix Terrazzo Flooring BP 09F – Painting BP 09G – Sound Absorbing Wall and Ceiling Panels BP 10A – Signage BP 10B – Toilet Partitions & Accessories BP 10C – Operable Partitions BP 12A – Window Treatments BP 21A – Fire Protection BP 22A – Plumbing Systems BP 23A – HVAC Systems BP 26A – Electrical Systems BP 27A - Communications Additional Packages may be added and/or deleted at the discretion of the Construction Manager. Historically underutilized business firms are encouraged to complete participation submittals.

County of Lincoln NC
 Adam Harbin, Controller, c/o J.M. Cope Inc
 Login or create an account To view email

Published 10/31/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.