ID 727796
Clackamas County
Bid Date: 11/06/2024 at 02:00pm
Pre-Bid: 10/31/2024 @ 08:00am
Trades: General Swimming Pool Contractor, *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors
This project includes: Refinishing the pool shell surface. Shell dimensions approximately 83’ feet long, 42’ wide, with a depth sloping from 4’ to 12’. Verify all dimensions in field. Supply/Install protective material around work area. Limit impact only to pool deck area. Protect office space and HVAC from construction. Sweep, vacuum, pressure wash structure. Remove all existing paint via Hydro blasting. Install Commercial quartz- white plaster finish at a final finish depth of 3/8”. Reuse/reinstall main drain grate-Neptune Benson VGBA 2017. Supply/Install new in-wall steps and new inlet fittings to match new plaster surface depth. Supply/Install black tiled racing lanes (qty 6) – 2” x 2” tiles that are 12” wide. Supply/Install black tiled transition slope (qty 1) - 2” x 2” tiles that are 12” wide (width of pool and up wall). Supply/Install black tiled water polo lines (qty 2) - 2” x 2” that are 4” wide (width of pool and up wall). Waterproof gutter prior to new tile installation. Supply/install white gutter tile – 2” x 2” tiles (back gutter wall, bottom of gutter, outside and inside of gutter lip). Supply/install white gutter tile (top of gutter lip) - 1” x 2” or; alternate install of 264 Linear Feet of 16 gauge 316 2B stainless steel cover. Include welded joints and mitered corners. Include slip joints for expansion at 10 locations. Supply/Install standard white sanded grout. Install 2 new stainless-steel eyebolts for attaching lane ropes. Match existing, final location to be supplied by owner. 1 Year warranty for plaster and tile install- materials & workmanship by installer. All project and construction aspects must follow Oregon Health Authority Public Health Division Administrative Rules Chapter 333- Division 60: https://www.oregon.gov/oha/ph/healthyenvironments/recreation/poolslodgin... Bonds required. Prevailing wages.
Thomas Kissinger
Login or create an account
Owner: City of Oregon City OR
Published 10/23/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.