Terminal 1 Dredging & Turn Cell Installation, Morrow, OR

Morrow County

Bid Date: 11/12/2024 at 02:00pm

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Marine Contractor - General Engineering Contractor

The proposed project will occur on the Columbia River at River Mile (RM) 269.40 at the Port of Morrow’s existing Terminal 1 Slip. All accumulated sediment within the slip will be dredged down to the existing concrete bottom at elevation 243 (NGVD 29). Approximately 14,000 square feet area will be dredged just outside the slip entrance and down to the same elevation. Approximately 50,000 cubic yards of material will need to be removed. Dredge material will be disposed of in an upland containment basin already constructed directly adjacent to the Terminal 1 Slip. Return water will be treated through a three-stage series of settling ponds before it is discharged back into the river. In addition, one turning dolphin consisting of 3 pilings will be installed approximately 175 feet from the shoreline near the entrance to Terminal 1 to aid barges turning into the slip. The ODFW work window for this reach of the Columbia River is December 1 thru March 31. Bonds required. Prevailing wages.

Purchasing, via email only
 Login or create an account
 Login or create an account

Owner: Port of Morrow OR

Published 10/11/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.