ID 713401

Archived

Pearl Street Improvements, Belton, TX

Bell County

Owner Reference: 2022-161

Bid Date: 07/18/2024 at 10:00am

Pre-Bid: 06/25/2024
Harris Community Center located at 401 North Alexander, Belton, Texas 76513.

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Stormwater Pollution Prevention Plan (SWPP) - Regional Flood Planning Group (RFPG) - Flood Risk Reduction Plans, Traffic Signals, Control & Monitoring - Electrical & General Engineering Contractor

For Pearl Street, this project includes, but is not limited to, approximately 625 linear feet of curb and gutter, 490 linear feet of laydown curb, 2,885 SY of lime stabilized subgrade and 6” crushed limestone base material, 2,885 square yards of 7” reinforced concrete pavement, transfer of existing water services, SWPPP installations, and traffic control. There is also Add Alternate A which includes, but is not limited to, approximately 1,016 square yards of lime stabilized subgrade and 6” crushed limestone base material, 1,016 square yards of 7” reinforced concrete pavement. Bonds required. Prevailing wages.

City of Belton TX
 John Simcik
 Login or create an account To view email

Published 07/10/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.