ID 723395
Brazoria County
Owner Reference: 16759-0010-10
Bid Date: 10/15/2024 at 10:00am
Pre-Bid: 10/01/2024 @ 10:00am
Estimate: $5,200,000
Trades: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, *Landscaping Contractor: Grounds Maintenance Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping, Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Generator Contractor - Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems
The work consists of providing the necessary labor, material, equipment, and supervision to construct Ashland 0.2 MGD Wastewater Treatment Plant for Ashton Gray Development on behalf of Brazoria County Municipal Utility District No. 82. The site work contractor is responsible for all site work, including but not limed to clearing and grubbing of the site; construction of wood fence; buried piping at the wastewater treatment plant and filtersyard piping; effluent piping, manholes and effluent outfall; site work; on-site detention pond; swales, culverts, and inlets; storm piping and outfall; crushed concrete roads and IWTP pad; protective coatings, concrete pads; new utility electrical service; service entrance equipment; diesel generator and automatic transfer switch; 480V distribution panelboard; 120/240V panelboard; transformer; lighting contactor panel; autodialer; SPD; site lighting; electrical rack and supports; pull box; underground duct banks; wires and conduits from the terminal boxes at Aeration Basin No. 2 to the electrical rack; installation of the PLC panel at the rack; grounding; bollards; site grading; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not specifically addressed in lease agreement, complete in place for a fully functioning plant. Bonds required. Prevailing wages.
Nick Heilenman c/o Quiddity Engineering, LLC
Login or create an account
Login or create an account
Owner: Brazoria County MUD82 Municipal Utility District TX
Published 09/23/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.