ID 730204
Brazoria County
Owner Reference: 1931-8134 A&B
Bid Date: 12/06/2024 at 09:30am
14 Days until bid date
Pre-Bid: 11/19/2024 @ 09:30am
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor
Construction of the Water, Sanitary Sewer, Drainage Facilities & Paving and Appurtenances to Serve Caldwell Lakes Section 4. Bonds required. Prevailing wages.
Kathleen Kinchen, P.E
Login or create an account
Owner: Brazoria County MUD87 Municipal Utility District TX
Published 11/11/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.