ID 731610
Brazoria County
Owner Reference: 40997-14
Bid Date: 12/03/2024 at 02:30pm
9 Days until bid date
Pre-Bid: 11/14/2024 @ 04:00pm
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor
Water, Sanitary Sewer, Drainage and Paving Facilities for Sherry Lane Street Dedication. Bonds required. Prevailing wages.
David Dominguez
Login or create an account
Login or create an account
Owner: Brazoria County MUD81 Municipal Utility District TX
Published 11/20/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.