ID 717221

Archived

Carters Creek Wastewater Treatment Plant Outfall Improvements, College Station, TX

Brazos County

Owner Reference: 24-083

Bid Date: 09/10/2024 at 02:00pm

Pre-Bid: 08/20/2024
Carters Creek Wastewater Treatment Plant Training Room, located at 2200 N. Forest Pkwy, College Station, Texas, 77845.

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Pipeline Contractor: Water Mains, Sewer Lines, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera, Site Preparation, Sitework, Prep Work/Prepwork - General Engineering Contractor, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal

The City of College Station invites qualified contractors to submit bids for Construction of new structures as follows: a. Parallel 60” and 69” outfall pipes b. Junction box c. Outfall headwall structure with grouted riprap d. 60” stub-out for future connection e. Site work, grading, paving and drainage. Demolition of existing utilities as follows: a. Parallel 60” outfall pipes b. Outfall headwall. Bonds required. Prevailing wages.

City of College Station TX

Published 08/11/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.